OpenAI·AI Image Generator·Editing

GPT Image 2

OpenAI's most capable image model — state-of-the-art photorealism with pixel-perfect text rendering.

12credits/image
12credits/image (edit)
Text to Image

to start creating with GPT Image 2

A product photo of a coffee bag labeled "Summit Roast" with mountain artwork, on a rustic wooden table
Try this prompt
A product photo of a coffee bag labeled "Summit Roast" with mountain artwork, on a rustic wooden table
A detailed scientific infographic of the human cardiovascular system with labeled diagrams, annotations, and flow charts
Try this prompt
A detailed scientific infographic of the human cardiovascular system with labeled diagrams, annotations, and flow charts
Photorealistic 35mm film photograph of a young woman reading in a sunlit café, shallow depth of field, warm tones
Try this prompt
Photorealistic 35mm film photograph of a young woman reading in a sunlit café, shallow depth of field, warm tones
A pixel-perfect recreation of a mobile fitness app UI with navigation bar, progress charts, and workout cards
Try this prompt
A pixel-perfect recreation of a mobile fitness app UI with navigation bar, progress charts, and workout cards
Studio product shot of a luxury watch with visible mechanical movement, dramatic side lighting on dark marble
Try this prompt
Studio product shot of a luxury watch with visible mechanical movement, dramatic side lighting on dark marble

What Sets It Apart

Pixel-Perfect Text Rendering

The gold standard for text in images — dense paragraphs, small lettering, multilingual characters, ingredient lists, and complex layouts all render cleanly on the first try.

Sample output generated with GPT Image 2

State-of-the-Art Photorealism

A quality-first architecture that prioritizes photorealistic output above all else. Lighting, materials, skin textures, and environmental details reach a new standard of fidelity.

Three Quality Tiers

Choose Low (2 credits), Medium (12 credits), or High (40 credits) per image — scale from quick drafts to premium 4K output within a single model.

Brand-Consistent Product Photography

Generate product shots with accurate text on labels, logos, and packaging. Maintains brand consistency across hundreds of variations with correct color palettes and precise logo reproduction.

Built For

Product Photography

Generate e-commerce product shots with accurate labels, logos, and packaging text at scale.

Infographics & Marketing

Create infographics, carousel slides, and social posts with clean, legible text and data visualizations.

UI Prototyping

Generate pixel-perfect app mockups with realistic navigation, content, and typography — no code required.

Campaign Photography

Produce editorial-quality lifestyle and campaign shots with natural lighting and cinematic composition.

Technical Specifications

Type
Text to Image
Credits
12 / image
Edit Credits
12 / image
Provider
OpenAI
Aspect Ratios
1:1, 4:3, 3:4, 16:9, 9:16

How GPT Image 2 Compares

Every model below is available on Morphed — switch between them with the same prompt.

ModelCreditsTypeBest for
GPT Image 2This modelOpenAI
12 / imageText to ImageProduct Photography
GPT Image 1.5OpenAI29 / imageText to ImageMarketing & Advertising
GPT Image 1 MiniOpenAI2 / imageText to ImageInfographics
Flux 2Flux10 / imageText to ImageProduct Photography
Nano Banana Pro 🍌Google21.5 / imageText to ImageProfessional Photography

Frequently Asked Questions

Create with GPT Image 2 in three steps

01

Describe your idea

Write a prompt, or start from one of the examples above. GPT Image 2 handles detailed, multi-part prompts well.

02

Generate & iterate

Generate, compare variations, and refine. Each run costs 12 credits per image.

03

Download or keep editing

Export in full resolution, or send the result to another model on Morphed — upscale it, animate it, or edit it.

Ready to create with GPT Image 2?

Create an account, then pick a plan to start generating. Plans start at $9/month — 30% off your first 3 months, cancel anytime.